Turnkey installation
Lift Design, Manufacturing & Installation
One team from the first site survey to the final compliance certificate.
Overview
One team from the first site survey to the final compliance certificate.
Sakshi Elevators designs, manufactures and installs its own lifts, so a single team is accountable from the first conversation to the day you hand the keys to residents, patients or staff.
The turnkey scope covers site survey and shaft dimensioning, structural steel tower installation where required, electrical wiring, testing and final compliance certification — for new buildings and, for home lifts, existing ones.
- Residential villa lifts: typically around 2–3 weeks to install
- Commercial multi-storey projects: typically 4–8 weeks after civil shaft handover
- Timelines depend on shaft readiness and cabin specification
What's included
Everything from survey to certificate.
- 01
Site survey & shaft dimensioning
Measured survey of the shaft, pit and headroom so the lift is specified for the real building.
- 02
Design & manufacturing
Capacity, speed, drive, doors and cabin finishes engineered to your building type.
- 03
Structural steel tower
Steel hoistway structures where a masonry shaft is not available or practical.
- 04
Electrical wiring
Power, control and safety circuits installed and terminated.
- 05
Testing
Safety devices, levelling, doors and rescue systems tested before handover.
- 06
Compliance certification
Final compliance certification as part of the turnkey handover.

Who it's for
Built for every kind of client
Homeowners
Villa and duplex lifts, including retrofit into existing homes.
Builders & developers
Passenger lifts for apartment and commercial projects.
Architects & consultants
Capsule and passenger lifts specified around the design intent.
Hospitals & industry
Stretcher lifts and heavy-duty goods lifts.
Covers every Sakshi lift type
How it works
From first call to final handover.
A clear, six-stage process — one accountable team from consultation and site survey through testing, certification and aftercare.
Step 1: Consultation
Tell us about your building and requirement — by phone, WhatsApp or the enquiry form.
Step 2: Site assessment
A technical site survey with shaft, pit and headroom dimensioning.
Step 3: Solution & quote
The right lift type, capacity, speed, drive and cabin — with a detailed quote.
Step 4: Installation
Manufacturing, structural steel where needed, rails, machine, cabin and wiring.
Step 5: Testing
Safety devices, levelling, doors and rescue systems tested end to end.
Step 6: Handover & AMC
Compliance certification, handover and an optional customised AMC.
FAQs
Common questions
Do you handle the complete installation?
Yes. Sakshi Elevators offers complete end-to-end execution — site survey, shaft dimensioning, structural steel tower installation, electrical wiring, testing and final compliance certification.
How long does lift installation take?
Residential villa lifts typically take about 2–3 weeks; commercial multi-storey projects about 4–8 weeks after the civil shaft is handed over. Shaft readiness and cabin specification affect the timeline.
Can you install a lift in a building that is already complete?
For homes, yes — compact MRL and hydraulic lifts are designed to fit existing stairwell voids, structural openings or external glass hoistways. For other buildings, a site survey determines what is feasible.
Request a site visit
Our team will survey your building and recommend the right lift — with a detailed, no-obligation quotation.

Start your project
Looking for the right lift solution?
Talk to the Sakshi Elevators team and find the right solution for your building.